Situation: Terrorist forces have captured Alaskan Pipeline pump station at grid WA542679, with the intent of creating an environmental disaster. Mission: ODA 20-2 will secure Alaskan Pipeline station at grid WA542679 and negate environmental threat by accomplishing one of the following: secure main control panel; stop oil flow at the three valve controls. ROE: Minimize damage to oil storage containers and pipes. Enemy: Enemy consists of a squad-sized terrorist force inside the main pump station. Troops: One Special Forces A Team. Terrain: Alaskan Pipeline Pump Station consisting of three structures; the pump station, the exterior oil tanks and a one story out-building housing the emergency shut off valve.